Follow the project stages
Construction, transit, erection, testing and operation can involve different cover periods. List all parties with an insurable interest and identify when responsibility transfers at delivery or handover.
Define the equipment
Contractors’ plant, electronic equipment, boilers and installed machinery can require separate descriptions or policies. Compare the testing period, defective design exclusions, debris removal and third-party liability.
Record changes as work progresses
Maintain the contract, bills of quantities, delivery and commissioning records. Ask for extensions before delays carry work past the insured end date. Financial loss from delayed commissioning requires a separate applicable benefit.
A practical example
A new processing line is damaged during a test run shortly before handover. Construction, testing and operational phases may have different insured dates, machinery descriptions and limits.
What to compare before buying
Compare the contract schedule to the policy dates. Check testing, maintenance visits, contractor equipment, surrounding property and whether delay in start-up is separately insured.
Documents and claim checks
Retain the test log, commissioning plan, progress certificates, photographs and engineer’s report. Separate repair costs from redesign, improvements or costs due solely to delay.
Providers and official resources
Marine Cum Erection Insurance
Project insurance can connect equipment transit with erection, testing and commissioning. The insurer also describes a site-only approach where transit is already insured.
What to check Compare the supplier’s delivery terms with the start of transit cover, permitted storage, test period and handover dates.